Technical team
Asian Dragon and associates have a technical
team composed of experienced engineers and
technicians, all of which are well educated.
60% of technical staffs have education
degree above bachelor.
We adopt international standard procedure to
develop new products. Introduce advanced
technology to manufacture products. We pay
close attention to market tendencies, center
on customers’ real demand, and provide a
total package. From new-product ideas,
industrial design, outline design, function
design to three-dimension drawing (CAD),
process plan, quality control, Asian Dragon
International in association with its
partners and colleagues take everything into
consideration in a considerable effort to
supply pleasing designs, high-grade,
environmentally “in tune” buses and coaches,
all the technical staff aim to solve any
problems or consider your own design
requirements.
Process characteristic
(1) adopt press tool, roller press, spot welder
(2) adopt NC (numerical control) bender to form the frame
(3) for metal components, adopt electrophoresis to prevent rust; for body, adopt alramenting to prevent rust.
Introduction to the
Bus Assembly Line
Client shall start the project with around
USD three hundred thousand (investment on
equipment and machines only) determined by
quantity of buses you wish to produce.
②
Project characteristic
1. low investment
2. three advantages
②
normally, a typical assembly line can only assemble one model of vehicle. While adopting our assembly line technology the client can assemble three models of similar buses②
Asian Dragon and its associates will train adequate local technicians for production and after-sales service.
3. sustained development in a compound-interest
way ( roll-snowball mode) After starting the
project with lower investment, the client
can expand reproduction with money made by
previous investment. In such a way, the
assembly line could be expanded with low
risk and no additional outlay of capital.
Dragon and its associates shall be
responsible for project planning, factory
layout, process planning, equipment
arrangement, technical guidance, pre-operation,
supplying qualified parts of products, etc.
while client shall be responsible for all
cost, factory construction, logistic
facilities, manufacturing and marketing for
the products. Cooperation details are
subject to the final contract signed by and
between both parties.
Project Implementation
Right and obligation of each party
Client: building factory, marketing,
assembling bus, responsible for after-sales
service
Dragon: planning process planning;
purchasing key equipment; supplying clamping
devices; guiding assembly line construction;
developing product; supplying sample;
working out technical material to guide
production and quality control; supplying a
kit of parts of products that are
preprocessed; guiding production for client;
continuous technical support. Dragon shall
provide a package of services according to
different conditions and expectations the
client. From product location, industrial
design, outline design, function design,
equipment arrangement to three-dimension
drawing (CAD), process plan, quality
control, technical training, production
management, quality control, Asian Dragon
International take everything into
consideration, we will design a time table
after negotiating with the client. Then a
cooperation contract shall be signed by and
between both parties.
Second phase
:Project preparationAsian Dragon
International :
②
Process designing and planning: To guide Factory construction and purchasing equipment.②
Designing and development of products: Playing a main role in 6 to 12 meters diesel and CNG bus, conceiving in modularization, standardization, generalization, we develop 6 to 12 meters series buses. We finished Engineering Drawing to guide our cooperators mass producing with the method of developing process from sample to production and improving samples and technological equipment.②
Documents of techniques and quality management: Our cooperators take the responsibility of all assembly process beginning with welding frame, Asian Dragon International take the responsibility of developing samples, compiling technical documents and quality management at the same time, guiding mass production locally.②
Designing and producing of equipment: Manual welding at the first stage; clamping device are used in assembly line after mass production. These tooling and fixtures are including clamping device, frame clamping device, body press tool and other necessary equipment. To guarantee the quality of bus we adopt the process of samples to production. (see clamping device in the illustrations)②
Process designing and planning: To guide Factory construction and purchasing equipment.
Third phase: project implementation
◆
processing of spare parts (CKD) and exporting parts to overseas partner—parts include stamping parts, body structural member, chassis, engine and other fittings ; Dragon shall be responsible for this.◆
installing and checking the assembly line — Dragon and associates shall send its technicians and engineers to overseas factory to install and checking the assembly line and produce samples with the parts supplied by Dragon.◆
technical support — Dragon and associates shall train local technicians for the client, so that local factory operates well under the administration of the client.◆
trial production—in the light of work process and quality control requirement, Dragon ’s engineer shall guide local workers to undertake trial production. Forth phase: project evaluation and improvement◆
project evaluation: according to the trial production, both parties shall evaluate the project and implement relevant adjustment and improvement.◆
subsequent activities: according to the actual condition of local factory and local market, Dragon shall upgrade its product and provide continuous technical support for its client.